Why the site survey and good drawings matter on every fire and security job

By Tom, Fortis Fire & Security · 4 min read · 11 Nov 2026 · Updated 19 Nov 2026

Every fire and security job is won or lost before the first cable goes in. The site survey decides what gets installed, and the drawing that comes out of it is what everyone works from: the customer agreeing the price, the engineers on the day, and whoever maintains the system years later.

At Fortis Fire & Security, the free site survey is the first of four steps on every job, before the recommendations, the installation and testing, and the ongoing maintenance. Here's why it carries so much weight, and what a good survey drawing shows.

What the survey is for

A survey answers three questions:

  • What is the building, and how is it used? A home, an office, a school with several blocks and a playground, a site with gates and a car park.
  • What does the customer need protecting against? Fire, break-ins, vandalism, unauthorised visitors, or all of them.
  • What's already there? Existing panels, cameras, readers and cabling that might be kept, extended or taken over.

From that, the installer can make clear recommendations in plain language, which Fortis aims for: what's needed, why, and nothing the customer doesn't need.

Why it goes wrong without a good drawing

A written quote that says "supply and fit 12 detectors and 4 cameras" leaves almost everything open. Which rooms? Which way do the cameras face? Where does the panel go? When those answers live only in the surveyor's head or a notebook, problems show up later:

  • Scope arguments. The customer thought the store room was covered; the quote didn't include it.
  • Wasted visits. Engineers arrive and find a ceiling they can't get through or a wall where the cable route was meant to be.
  • Cameras that see the wrong thing, or that look straight into next door's garden, which brings data protection duties under the ICO's guidance on domestic CCTV.
  • No record for maintenance. Years on, nobody is sure which device is which.

Fire alarms make the point clearly

For commercial fire alarms, the Fire Industry Association's guidance on BS 5839-1 points out that several system categories (L2, L3, L5 and P2) aren't fully defined until you say which areas are covered and with what type of detector. It also notes that customers often don't know which category they need, and that BS 5839-1 recommends the designer makes the proposed category clear before an order is placed, precisely to avoid disputes mid-contract. A marked-up plan showing the rooms covered is the plainest way to do that. We explain the categories in commercial fire alarms: the BS 5839-1 categories.

What a good survey drawing shows

Start from the building's floor plan, ideally the architect's PDF, and mark up:

  1. Every device, by type. Smoke and heat detectors, call points, sounders, cameras, door readers, keypads, intercoms, network points, the control panel or recorder.
  2. Zones and areas. Fire alarm zones, alarm areas, rooms included and excluded, outbuildings.
  3. Walls and obstacles that matter for coverage or cabling, including anything not on the original plan.
  4. Cable routes between devices and back to the panel, so the engineers can price and plan the install.
  5. Camera coverage. Which way each camera faces and roughly what it sees, so the customer can agree it and you can check it stays on their property where that matters.
  6. Notes and photos from the walk-round: ceiling types, access issues, existing kit.
  7. A title block with the site, the date, the revision and who drew it.

That one drawing becomes the quote attachment, the installation sheet and, once updated after installation, the record for maintenance.

The same drawing, three readers

  • The customer sees exactly what they're paying for, room by room, and can say "add the store room" before the work, not after.
  • The engineers know where every device and cable goes before they unload the van.
  • The maintainer, whether the same firm or another, can find each device and see what was installed and why.

For schools and larger sites, where Fortis's work can combine fire alarms, intruder alarms, CCTV, access control, automated gates and lockdown systems on one site, one shared plan makes it far easier to keep every system straight.

Doing it on a phone

Surveys happen on ladders and in car parks, not at desks. The less re-typing between the site and the office, the fewer things get lost. Capture positions, notes and photos on site, then tidy the drawing up afterwards, rather than redrawing from a notebook.

Where FortiDraw fits

FortiDraw, a joint venture between Fortis and Alpaca Mango, is a floor-plan mark-up tool for this kind of drawing. Upload the PDF plan, place symbols for detectors, call points, cameras, readers and network points, draw zones and walls, link devices with cable rails, see each camera's coverage cone, and add title blocks and sheets. On site, the phone mode lets you add notes, photos and voice memos as you go. Back at the desk, export the annotated PDF for the quote and the customer.

It doesn't design to a standard or sign anything off; that's still the job of a competent surveyor and designer. It makes the drawing quick to produce and easy to share.

Try FortiDraw free on your next survey. To see the range of work a survey can lead to, read what a fire and security installer does.

More on Installers

Fire alarm grades explained: A, C, D1, D2, F1 and F2Fire alarm grades describe the kind of system in a home. The six grades in BS 5839-6:2019+A1:2020, how a grade differs from a category such as LD2, and which grade is recommended where.Fire safety · 5 min · 19 Nov 2026Fire alarm system categories explained: M, L1–L5, P1, P2 and LD1–LD3Every UK fire alarm system category on one page: M, L1 to L5, P1 and P2 from BS 5839-1, and LD1 to LD3 from BS 5839-6 for homes, each in a sentence or two, with a diagram and links to the detailed guides.Fire safety · 4 min · 19 Nov 2026L1 fire alarm system requirements: what whole-building cover meansAn L1 fire alarm system has automatic detection throughout the building. The L1 definition, the low-risk areas BS 5839-1 lets you leave out, what changed in 2025, and when L1 is specified.Fire safety · 3 min · 19 Nov 2026