FortiDraw
Features for a real installation.
From the first device on your plan to the drawing you send. See what each tool does, and what the result looks like.
01 / Device library
The right device, ready to place.
Start with the symbols your job needs, rather than building a drawing library from scratch. Keep fire, CCTV, network and access-control devices together on the same plan.
- Search or filter by discipline
- Place by click or drag
- Keep wired and wireless devices distinct
02 / Zones and shapes
Make the areas that matter visible.
A coloured area communicates boundaries at a glance. Give an installer or customer a clear picture of which spaces a system serves, alongside walls, annotations and notes.
- Rectangles, circles and freeform zones
- Editable colours and boundaries
- Lines, arrows, text and notes
03 / Simple plans
A clean plan from a busy drawing.
Architects' drawings carry furniture, dimensions and notes that crowd a fire or security plan. Simplify it into the walls, doors and room names, then check the tracing against the original before you rely on it.
- Traced onto a new page; the original stays
- Rooms you can move, resize and rename
- Compare: the tracing, both, or the original
04 / Evacuation plans
An evacuation plan, ready to put up.
An evacuation plan reads best on a simple plan. Make one straight from the architect's drawing, or from a simple plan you have already checked, and the evacuation design is put on it for you.
- A3 and A4 evacuation designs
- You are here, ISO exits and equipment
- Green escape routes; print in colour
05 / Device connections
Show how the installation connects.
Device positions are only part of an installation. Show the intended connections and routes on the same drawing, so the design can be discussed before work starts.
- Connect devices on the plan
- Curved or right-angled rails
- Adjustable routes and bend points
06 / Legends
A drawing that explains itself.
A reader should not have to guess what a symbol means. A legend brings the drawing and device quantities together, helping you communicate the design and check a schedule.
- List the devices on the page
- Counts follow the drawing
- Rename entries or hide counts
07 / Saved work
Pick up where the job left off.
A survey and a finished drawing rarely happen in one sitting. Reopen the project to continue the job, and undo a change when you need to try another approach.
- Saved to your signed-in account
- Undo and redo while editing
- Reopen projects from another computer
08 / Export
Send the plan. Keep the detail.
Move from a working drawing to something another person can use. Share a marked-up PDF with an installer or customer, and export the placement data when you need a separate schedule.
- Annotated PDF output
- CSV device schedules
- JSON placement data